The Space Shuttle

5 Jan 1972 – 21 Jul 2011, 09:57:5455 items

spaceusa
Atlantis lifts off from Pad 39A on STS-132, 14 May 2010. Photo: NASA. Public domain.
Atlantis lifts off from Pad 39A on STS-132, 14 May 2010. Photo: NASA. Public domain.

Thirty years, five orbiters, 135 missions

From Nixon’s go-ahead in 1972 and Enterprise’s glide tests over the Mojave to the last wheel stop in Florida on 21 July 2011. The shuttle launched Hubble, docked with Mir, built most of the International Space Station and carried people from sixteen countries. Two orbiters and fourteen astronauts were lost.

The fleet

  • Columbia: 28 missions, 1981–2003

  • Challenger: 10 missions, 1983–1986

  • Discovery: 39 missions, 1984–2011

  • Atlantis: 33 missions, 1985–2011

  • Endeavour: 25 missions, 1992–2011

How to read it

Each orbiter is a band from its first launch to its last landing, and the two stand-downs after the losses are bands of their own. Zoom in on three days to the second: STS-1 in April 1981, Challenger’s 73 seconds on 28 January 1986, and Columbia’s re-entry over the American South-West on 1 February 2003.

Filter by orbiters, firsts, losses, investigations, space stations or space telescopes. Times are UTC; the notes give the local clock time where it matters.

What it cost

In 1972 NASA put development at about $5.5 billion. Roger Pielke Jr. and Radford Byerly, adding up NASA’s budgets in Nature (2011), counted more than $192 billion in 2010 dollars spent from 1971 to 2010: about $1.5 billion a launch over the programme’s life, and $1.2 billion in the operational years from 1982.

For a successful technology, reality must take precedence over public relations, for nature cannot be fooled. — Richard Feynman, Rogers Commission report, Appendix F

Items

  1. Nixon approves the Space Shuttle

    San Clemente, California

  2. ≈ 4 years, 8 months
  3. Enterprise rolls out

    Rockwell plant, Air Force Plant 42, Palmdale

  4. Approach and Landing Tests

    8 months, 10 days · Edwards Air Force Base, California

  5. Enterprise flies free

    Rogers Dry Lake, Edwards Air Force Base

  6. ≈ 3 years, 5 months
  7. Columbia

    ≈ 21 years, 9 months

  8. STS-1: Columbia lifts off

    Launch Complex 39A, Kennedy Space Center

  9. STS-1 lands on Rogers Dry Lake

    Rogers Dry Lake, Edwards Air Force Base

  10. STS-3 lands at White Sands

    Northrup Strip (White Sands Space Harbor), New Mexico

  11. Challenger

    ≈ 2 years, 9 months

  12. Sally Ride, first American woman in space

    Launch Complex 39A, Kennedy Space Center

  13. Guion Bluford, first African American in space

    Launch Complex 39A, Kennedy Space Center

  14. Spacelab

    ≈ 14 years, 5 months

  15. Ulf Merbold, Spacelab’s first flight

    Launch Complex 39A, Kennedy Space Center

  16. McCandless flies untethered

  17. First landing in Florida

    Shuttle Landing Facility, Kennedy Space Center

  18. Discovery

    ≈ 26 years, 6 months

  19. Enterprise on Vandenberg’s SLC-6

    Space Launch Complex 6, Vandenberg Air Force Base

  20. Atlantis

    ≈ 25 years, 9 months

  21. Thiokol’s engineers argue against launching

    Morton Thiokol's Wasatch plant, Promontory, Utah

  22. Challenger’s last flight

    1 minute, 50 seconds

  23. Challenger lifts off

    Launch Complex 39B, Kennedy Space Center

  24. Black smoke at the right booster’s aft joint

  25. Flame breaks through the joint

  26. “Go at throttle up”

  27. Stand-down after Challenger

    ≈ 2 years, 8 months

  28. Challenger breaks apart

    Over the Atlantic off Cape Canaveral

  29. Reagan speaks to the nation

    Oval Office, White House

  30. Rogers Commission

    4 months, 3 days

  31. Feynman’s glass of ice water

    Washington, DC

  32. STS-26: Discovery returns to flight

    Launch Complex 39B, Kennedy Space Center

  33. Hubble is deployed

  34. Endeavour

    ≈ 19 years

  35. Three spacewalkers catch Intelsat VI

  36. STS-61: Hubble gets its glasses

    ≈ 10 days, 19 hours

  37. Shuttle–Mir

    ≈ 4 years, 4 months

  38. Atlantis docks with Mir

  39. John Glenn flies again

    Launch Complex 39B, Kennedy Space Center

  40. Building the International Space Station

    ≈ 12 years, 7 months

  41. Eileen Collins commands; Chandra goes up

    Launch Complex 39B, Kennedy Space Center

  42. STS-107: Columbia’s last mission

    ≈ 15 days, 22 hours

  43. Foam strikes the left wing

  44. Request to photograph the wing is cancelled

  45. Columbia Accident Investigation Board

    6 months, 26 days

  46. The search for Columbia

    2 months, 28 days · Columbia debris corridor, East Texas and western Louisiana (roughly)

  47. Columbia’s re-entry

    44 minutes, 48 seconds · Columbia's re-entry ground track, California to Texas (roughly)

  48. Entry interface

  49. Left-wing sensors drop out

  50. Last words from Columbia

  51. Stand-down after Columbia

    ≈ 2 years, 5 months

  52. A foam block punches a hole in a wing

    Southwest Research Institute, San Antonio

  53. Bush sets the shuttle’s retirement

    NASA Headquarters, Washington

  54. STS-114: return to flight

    Launch Complex 39B, Kennedy Space Center

  55. STS-125: last visit to Hubble

    Launch Complex 39A, Kennedy Space Center

  56. STS-135: the last launch

    Launch Complex 39A, Kennedy Space Center

  57. Wheel stop

    Shuttle Landing Facility, Kennedy Space Center