Railways: From Stockton to the Shinkansen

27 Sep 1825 – 202454 items

railwaystransport
A 0 series Shinkansen, the type that opened the Tōkaidō line in 1964, passing Mount Fuji between Mishima and Shin-Fuji, 1999. Photo: Shellparakeet. CC0, via Wikimedia Commons.
A 0 series Shinkansen, the type that opened the Tōkaidō line in 1964, passing Mount Fuji between Mishima and Shin-Fuji, 1999. Photo: Shellparakeet. CC0, via Wikimedia Commons.

Two centuries of rails around the world

On 27 September 1825 a steam locomotive pulled a train of coal wagons and cheering passengers from Shildon towards Stockton-on-Tees. Within a lifetime railways crossed North America, Siberia and the Andes. Within two, trains ran at 300 kilometres an hour from Tokyo to Osaka, Paris to Lyon, and across China.

This timeline follows the rails across every inhabited continent: the first lines in Britain, Belgium, Cuba, India, Egypt, Japan and China; the great lines of empire and nation; the record runs; and the high-speed networks. It also counts what the lines cost the people who built them, from Chinese crews in the Sierra Nevada to Indian workers in Kenya and forced labourers on the Burma Railway, with death tolls given as the range the named sources give.

Two calendars

Russia kept the Julian calendar until February 1918, so Russian sources date the Tsarskoye Selo Railway and the Trans-Siberian Old Style. Those items are entered in the Julian calendar as the sources write them, and the app places them on the same axis as the Gregorian dates everywhere else: the first sod at Vladivostok, 19 May 1891 Old Style, is 31 May in the Gregorian calendar.

How it is laid out

  • Periods: Britain’s railway mania, the building of each great line (Panama, the first American transcontinental, Peru’s Central, the Canadian Pacific, the Trans-Siberian, the Uganda and Hejaz railways, the Burma Railway, TAZARA, the Channel Tunnel and Qinghai–Tibet), the diesels’ takeover in America and China’s high-speed build-out.

  • Threads to filter by: steam, electrification, high speed, records, transcontinental, labour and colonialism.

  • The map: most lines are drawn as routes, from the Nullarbor to Tibet and from the Andes to the Hejaz, so the map shows where the rails went.

Items

  1. The Stockton and Darlington Railway opens

    Stockton and Darlington Railway, Witton Park to Stockton

  2. Rocket runs its trial at Rainhill

    The Rainhill level

  3. The Liverpool and Manchester Railway opens

    Liverpool and Manchester Railway, Edge Hill to Liverpool Road

  4. William Huskisson is killed by Rocket

    Parkside, near Newton-le-Willows

  5. The Best Friend of Charleston starts America’s first steam service

    Line Street, Charleston, South Carolina

  6. Brussels to Mechelen: steam reaches the Continent

    Brussels (Allée Verte) to Mechelen

  7. Russia’s first railway opens to Tsarskoye Selo

    Tsarskoye Selo Railway, Saint Petersburg to Tsarskoye Selo

  8. Havana to Bejucal: Latin America’s first railway

    Havana to Bejucal

  9. Railway mania

    ≈ 3 years

  10. Building the Panama Railroad

    4 years, 7 months · Panama Railroad, Colón (Aspinwall) to Panama City

  11. Bombay to Thane: India’s first passenger train

    Bori Bunder, Bombay, to Thane

  12. Alexandria to Cairo: Africa’s first railway

    Alexandria to Cairo

  13. Building the first transcontinental railroad

    ≈ 6 years, 4 months · Union Pacific and Central Pacific, Omaha to Sacramento

  14. The Metropolitan Railway opens under London

    Metropolitan Railway, Paddington (Bishop’s Road) to Farringdon Street

  15. Three thousand Chinese workers strike in the Sierra

    Sierra Nevada, between Cisco and Truckee

  16. The golden spike at Promontory Summit

    Promontory Summit, Utah

  17. Building the Central Railway of Peru

    ≈ 23 years · Central Railway of Peru, Callao to La Oroya

  18. Shimbashi to Yokohama: Japan’s first railway

    Shimbashi to Yokohama

  19. The Woosung Road: China’s first railway, and its removal

    ≈ 1 year, 3 months · Woosung Road, Shanghai to Wusong

  20. Siemens runs the first electric passenger railway

    Berlin Trade Exhibition, Moabit

  21. Building the Canadian Pacific

    ≈ 4 years, 4 months · Canadian Pacific Railway, Montreal to Port Moody

  22. The Darjeeling Himalayan Railway reaches Darjeeling

    Darjeeling Himalayan Railway, Siliguri to Darjeeling

  23. The first Orient Express leaves Paris

    Gare de Strasbourg (now Gare de l’Est), Paris

  24. The railways put North America on standard time

  25. The last spike at Craigellachie

    Craigellachie, Eagle Pass

  26. The first deep-level electric tube opens in London

    City and South London Railway, King William Street to Stockwell

  27. Building the Trans-Siberian

    ≈ 25 years, 4 months · Trans-Siberian Railway, Chelyabinsk to Vladivostok by the Amur line

  28. Building the Uganda Railway

    ≈ 5 years, 5 months · Uganda Railway, Mombasa to Port Florence (Kisumu)

  29. The Tsavo man-eaters

    Tsavo River bridge

  30. Building the Hejaz Railway

    ≈ 8 years, 2 months · Hejaz Railway, Damascus to Medina

  31. Rails across the frozen Lake Baikal

    Across the ice of Lake Baikal, Baikal station to Tankhoi

  32. The Victoria Falls Bridge opens

    Victoria Falls Bridge

  33. The Beijing–Zhangjiakou railway opens

    Nankou station, Changping

  34. The Trans-Australian Railway is joined at Ooldea

    Ooldea, South Australia

  35. ≈ 16 years, 7 months
  36. Diesels replace steam on American railroads

    ≈ 26 years

  37. Mallard sets the steam speed record

    Stoke Bank, near Little Bytham

  38. Building the Burma Railway

    ≈ 1 year, 1 month · Burma Railway, Nong Pladuk to Thanbyuzayat

  39. The Tōkaidō Shinkansen opens

    Tōkaidō Shinkansen, Tokyo to Shin-Ōsaka

  40. Britain’s last main-line steam train

    The Fifteen Guinea Special: Liverpool to Carlisle by Settle, and back

  41. Building TAZARA, the Tanzania–Zambia Railway

    ≈ 5 years, 8 months · TAZARA, Dar es Salaam to Kapiri Mposhi

  42. The TGV starts service from Paris to Lyon

    LGV Sud-Est, Paris to Lyon

  43. Digging the Channel Tunnel

    ≈ 6 years, 4 months · Channel Tunnel, Folkestone to Coquelles

  44. The Seikan Tunnel opens under the Tsugaru Strait

    Seikan Tunnel, Honshu to Hokkaido

  45. Breakthrough under the Channel

    Under the Strait of Dover

  46. Building the Qinghai–Tibet Railway

    ≈ 5 years · Qinghai–Tibet Railway, Golmud to Lhasa

  47. The last main-line steam in the world, on the Jitong line

    Jitong Railway, Jining to Tongliao

  48. The V150 TGV reaches 574.8 kilometres an hour

    LGV Est, near Le Chemin, Marne

  49. China builds the world’s largest high-speed network

    ≈ 15 years, 11 months

  50. Beijing–Tianjin: China’s first 350 kilometre-an-hour line

    Beijing–Tianjin intercity railway

  51. The Wenzhou collision

    Shuangyu, Lucheng District, Wenzhou

  52. A Japanese maglev reaches 603 kilometres an hour

    Yamanashi maglev test line

  53. The Madaraka Express: Mombasa to Nairobi on a new line

    Mombasa–Nairobi Standard Gauge Railway

  54. Al Boraq: Africa’s first high-speed line

    Al Boraq, Tangier to Casablanca

  55. Whoosh: Southeast Asia’s first high-speed railway

    Whoosh, Halim (Jakarta) to Tegalluar (Bandung)